Friday, November 1, 2019
Why Projects Fail In Airbus-A380 In Singapore Airline Essay
Why Projects Fail In Airbus-A380 In Singapore Airline - Essay Example From this research it is clear that Airbus had high expectations regarding its most ambitious project of A380. It was a commercial aircraft, intended to guide in the new age of superjumbo airplane. It was also aimed to carry about 800 travellers and crewmembers. The problem with the project arrived during 2006 when the pre-assembled wiring, manufactured in Hamburg, Germany plant failed to be adjusted appropriately in the A380 aircraft frame. The wiring was designed by utilising old version of CATIA, an application commonly used in the aviation industry, where the body of A380 was manufactured by using upgraded version of similar application. Unfortunately, these versions were incompatible with each other and therefore, during the project lifecycle phase, the capability to share the design of aircraft between these two plants was conceded. As a consequence, considerable number of fabricated cabins developed could not be adjusted in the airplane. Hence, Airbus had no other option than halting the manufacturing work, delaying the deliveries of Aircrafts for two years and remodelling the wiring system. The expenses of the project failure exceeded about US$6 billion, positioning the program about two years behind the planned schedule. For any project to be successful, organisations must meet the delivery and production obligations made to its customers. However, Airbus was unable to fulfil its obligations towards the customers owing to the above stated problems causing the Airbus A380 project failure.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.